Meeting minutes 4 – 25/11/11 – Team 1


Leanne – has found two good LEDs: 1) Power = 2mW, Spectral bandwidth = 100nm or 2) Power = 1mW, Spectral bandwidth = 40nm
Dave – will look at calculations and decide on whether the power or bandwidth is more important for LED, has decided on a cable
Will – has decided on a detector
Alan – turned up late but has found a method of splicing for 0.02dBm per slice



Everyone is happy and will now start writing up the report for next week





Report

1.     Brief intro on problem
2.     Technical specification section
a.     Component, why we chose it and some physics if we want
3.     Calculations
4.     Cost of system, total cost (including wages)


Write in 3rd person (This LED was picked because….)



Wednesday 30th Nov – have a rough report ready for Ross to read over